7 inspection and maintenance, 1) servopack inspection, 2) servopack’s parts replacement schedule – Yaskawa Sigma-5 User Manual: Design and Maintenance - Rotary Motors - Analog Voltage and Pulse Train Reference User Manual

Page 42

Advertising
background image

1 Outline

1-22

1.7 Inspection and Maintenance

This section describes the inspection and maintenance of SERVOPACK.

(1) SERVOPACK Inspection

For inspection and maintenance of the SERVOPACK, follow the inspection procedures in the following table

at least once every year. Other routine inspections are not required.

(2) SERVOPACK’s Parts Replacement Schedule

The following electric or electronic parts are subject to mechanical wear or deterioration over time. To avoid

failure, replace these parts at the frequency indicated.

Refer to the standard replacement period in the following table and contact your Yaskawa representative.

After an examination of the part in question, we will determine whether the parts should be replaced or not.

Item

Frequency

Procedure

Comments

Exterior

At least once a year

Check for dust, dirt, and oil
on the surfaces.

Clean with compressed air.

Loose Screws

Check for loose terminal
block and connector
screws.

Tighten any loose screws.

The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the factory
settings before shipping. Be sure to confirm that the parameters are properly set before
starting operation.

Part

Standard Replacement

Period

Operating Conditions

Cooling Fan

4 to 5 years

• Surrounding Air Temperature: Annual average of

30

°C

• Load Factor: 80% max.
• Operation Rate: 20 hours/day max.

Smoothing Capacitor

7 to 8 years

Other Aluminum Electrolytic

Capacitor

5 years

Relays

Fuses

10 years

Advertising