1 checking the drive, 2 checking the power supply, Checking the drive – Festo Контроллеры двигателя SFC-LAC User Manual

Page 86: Checking the power supply

Advertising
background image

5. Commissioning

5−4

Festo GDCP−SFC−LACI−IO−EN en 0812NH

5.1.1

Checking the drive

Note
During operation, the drive must not strike a stop without
shock absorption.

·

Use shock absorbers or buffers on all stops
(exception: homing to a fixed stop).

·

Before commissioning, make sure that drive and
controller are completely set up and wired and that the
working space is adequate for operation with an effective
load.

·

Observe the notes in the operating instructions for the
axis used.

5.1.2

Checking the power supply

Caution
Interruption of running tasks due to inadequate load voltĆ
age supply (LOAD POWER DOWN")

·

Make sure that the load voltage supply tolerance can be
maintained at full load directly on the voltage terminal of
the SFC−LACI (see chapter 3.2).

Caution
Loss of reference position due to inadequate logic supply
voltage

·

Always carry out a reference run

every time the logic

voltage supply is switched on, in order to anchor the
measuring reference system to the reference point
(REF).

The SFC−LACI does not carry out any positioning tasks if it
is not referenced.

Advertising