5. Commissioning

5−7

Festo GDCP−SFC−LACI−IO−EN en 0812NH

5.2

Commissioning with the control panel (only type SFC−LACI−...−H2)

Information on the button functions and the menu structure
of the control panel can be found in Chapter 4.

Overview of initial commissioning

Commissioning steps

Chapter

1. Before switching on: make sure that there is no active

ENABLE signal on the controller interface.

5.1.3

2. Set the parameters for the reference run:

Ĉ Reference travel (homing) method
Ĉ Search speed to reference point
Ĉ Positioning speed to axis zero point

5.2.1

3. Activate control panel device control [HMI = on]

5.2.2

4. Carry out reference travel.

5.2.3

5. Teach the axis zero point

5.2.4

6. Teach software end positions

5.2.5

7. Set the tool mass.

5.2.6

8. Enter positioning records.

5.2.7

9. Carry out a test run. Check motion behaviour,

reference points and working range. Optimise as
required.

5.2.8

10. Test function of controller interface.

5.4

11. To complete commissioning, observe the operating

instructions.

5.6

Tab. 5/1: Commissioning steps