Once the option settings for the currently selected variables are complete, other POUs
can be also be selected - without closing the dialog before - and given an option
configuration. This can be carried out for any desired number of POU selections, one
after the other.

When the dialog box is closed by selecting OK, all configurations carried out since the
dialog box was opened are applied.

Note!

Regard the possibility of using pragmas in the declaration of a variable, which
define that the variable is taken to the symbol file with restricted access or that it is
excluded from the symbol file.

The settings will be stored in »PLC Designer«.

6.2.12

Options for 'Project source control'

This dialog is used to define whether the project should be managed in a project data
base and to configure the ENI interface correspondingly.

Options dialog box of category Project source control

Use source control (ENI): Activate this option, if you want to access a project data base
via the ENI Server in order to administer all or a selection of POUs of the project in this
data base. Preconditions: ENI Server and data base must be installed and you must be
registered as an user in the database. See also the documentation for the ENI-Server
resp. in chapter 'ENI'.