L-force | plc designer – Lenze PLC Designer PLC Designer (R2-x) User Manual

Page 420

Advertising
background image

L-force | PLC Designer

The Resources

418

DMS 3.2 EN 02/2011 TD29



The possible stati:

Idle

has not been started since last update; especially used for event tasks

Running

has been started at least once since last update

Stop

stopped

Stop on BP

stopped, because breakpoint in task is reached

Stop on Error

Error, e.g. division by zero, page fault etc.

Stop Watchdog

cycle time has been exceeded

The task entry will be displayed red coloured in case of status 'Stop on Error' or 'Stop
Watchdog' .

Display of the time flow of the tasks

If the entry 'Taskconfiguration' is selected in the configuration tree, the utilization of
the tasks will be displayed in bar charts in the right part of the window:

Display of the Task Execution in Online Mode

For each task a bar chart is displayed. The length of the bar represents the length of a
cycle period. Below the bar as well as by appropriate marks on the bar the following
measurement values are illustrated:

Min:

minimum measured runtime in μs

Akt:

last measured runtime in μs

Max:

maximum measured runtime in μs

Cycle:

total length of a cycle in μs

Jitter:

maximum measured jitter (time between when the task was started and when the
operating system indicates that it is running) in μs

Advertising