If the system reports, L-force | plc designer – Lenze PLC Designer PLC Designer (R2-x) User Manual

Page 222

Advertising
background image

L-force | PLC Designer

The Individual Components

220

DMS 3.2 EN 02/2011 TD29



• Online Change on PLC1, Re-saving download information for PLC1:

In order to make possible the Online Change for proj.pro on PLC1, first the
download information referring to the download of proj.pro on PLC1 must be
restored. At login »PLC Designer« is looking for a file proj00000001.ri. But you have
stored the appropriate download information in file proj00000001_PLC1.ri.
Now you have 2 possibilities:
− You can rename proj00000001_PLC1.ri again to proj00000001.ri. Thus at a

login on PLC1 automatically the appropriate download information is available
and »PLC Designer« will ask you whether you want to do an Online Change.

− Instead of this you explicitly can load the file proj00000001_PLC1.ri before

login by using command 'Project' 'Load Download Information'. In this case no
renaming of the ri-file is necessary.

• Online Change on PLC2, Re-saving download information for PLC2:

In order to make possible an Online Change concerning the modifications in

proj.pro done in (3) also on PLC2 please perform the corresponding steps for
proj00000001_PLC2.ri as described in step (4) .

6.6.2

If the system reports

Error:

"The selected controller profile does not match that of the target system..."

Check that the target system entered in the target system settings (Resources)
matches the parameters entered in 'Online' 'Communications parameters'.

Error:

„Communication error. Log-out has occurred"

Check whether the controller is running. Check whether the parameters entered in
'Online' 'Communications parameters' match those of your controller. In particular,
you should check whether the correct port has been entered and whether the baud
rates in the controller and the programming system match. If the gateway server is
used, check whether the correct channel is set.

Error:

"The program has been modified! Should the new program be loaded?"

The project which is open in the editor is incompatible with the program currently
found in the PLC (or with the Simulation Mode program being run). Monitoring and

debugging is therefore not possible. You can either choose "No," logout, and open the
right project, or use "Yes" to load the current project in the PLC.

Advertising