Direct call of a cross reference list out of a POU editor or a watch list:

The cross reference list can be generated directly out of the editor (ST, FUP, KOP, AWL,
CFC, AS), which is used to work on a POU, or out of a watch list. In this case in online as
well as in offline mode the command Show cross references is available in the context
resp. "Extras" menu,when a variable is selected in the editor resp. the watch list.

6.4.18

'Project 'Data Base Link'

This menu item is only available if you have activated the option 'Use source control
(ENI)' in the project options dialog for category 'Project source control'. A submenu is
attached where you find the following commands for handling the object resp. the
project in the currently connected ENI data base:

• Login (The user logs in to the ENI Server)

If an object is marked in the Object Organizer and the command Data Base Link is
executed (from the context menu, right mouse button), then the following commands
will be available for executing the corresponding data base actions. If the user had not
logged in successfully to the ENI Server before, then the dialog 'Data base Login' will
open automatically and the chosen command will not been executed until the login
was successful:

• Define
• Get Latest Version
• Check Out
• Check In
• Undo Check Out
• Show differences
• Show Version History