9 making previous method version current, 10 print method report, Making previous method version current 5 – Metrohm tiamo 2.3 Patch 1 User Manual

Page 1671: Print method report 5

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

9 How to proceed?

tiamo 2.3 Patch 1

■■■■■■■■

1655

9.6.9

Making previous method version current

How to proceed?

1 Select program part Method.

2 Click on the symbol or menu item File Method manager….

The dialog window Method manager opens.

3 In the list box Method group select the desired method group.

4 Select desired method.

5 Click on [History].

The dialog window Method history showing a table with all ver-
sions
of the selected method is opened.

6 Select desired method that is to be made current.

7 Click on Make [current].

The selected method version is set as the current method version.
The method will be saved, the version number is increased by +1
compared to the last method version that was saved.

9.6.10

Print method report

How to proceed?

1 Select program part Method.

2 Click on the symbol or the menu item File Open....

The dialog window Open method opens.

3 In the list box Method group select the desired method group.

4 Select desired method or enter name in the field Method name.

5 Click on [Open].

The selected method is opened in the main window in the place of a
method that is already opened. The method name is displayed in the
title bar of the program; the number of currently opened methods is
displayed in the left upper corner of the method symbol.

Advertising