1 before switching on, Before switching on – Lenze EVF9333−xV User Manual

Page 169

Advertising
background image

Commissioning

Before switching on

6

6.1

l

6.1−1

EDSVF9333V EN 6.2−04/2012

6.1

Before switching on

)

Note!

ƒ

Comply with the corresponding switch−on sequence.

ƒ

In the event of trouble during the commissioning phase, the
"Troubleshooting and fault elimination" chapter will assist
you.

To prevent injury to persons or damage to material assets, check ...

... before connecting the mains voltage:

ƒ Wiring for completeness, short circuit, and earth fault

ƒ The "EMERGENCY STOP" function of the entire system

ƒ The motor circuit configuration (star/delta) must be adapted to the

output voltage of the controller

ƒ The in−phase connection of the motor

ƒ The direction of rotation or the incremental encoder (if available)

... the most important drive parameter settings before the controller is
enabled:

ƒ Is the V/f rated frequency adapted to the motor circuit configuration?

ƒ Are the drive parameters relevant for your application set correctly?

ƒ Is the configuration of the analog and digital inputs and outputs

adapted to wiring?

Advertising
This manual is related to the following products: