Lenze PLC Designer V2.x User Manual
Page 105
Advertising
1.3 EN - 07/2012
L
105
PLC Designer V2.x| Lenze Application Samples
Working with the sample projects
9400 HighLine - "LAS_40_INTF_Can_94HL_TabPos" sample project
4. Update the project by clicking
:
• Select the option Rebuild all
• Click the Build button to update the project.
5.
Going online
– After a connection to the controller has been established successfully, the following
status is displayed in the Status line:
6.
Download parameter set
– This command causes parameter settings in the controller to be overwritten by
parameter settings of the »Engineer« project.
Advertising