2 short overview of the functions, 3 commissioning, Commissioning – Lenze PLC Designer V2.x User Manual

Page 62: Plc designer v2.x| lenze application samples

Advertising
background image

PLC Designer V2.x| Lenze Application Samples

Working with the sample projects

8400 HighLine - "LAS_40_INTF_Can_84HL_TabPos" sample project

62

L

1.3 EN - 07/2012

8.2.2

Short overview of the functions

8.2.3

Commissioning

1. Wire the power connections

– Use the mounting instructions supplied with the controller to correctly use the

power connections according to the requirements of your device.

2. Wire the control terminals
3. Connect USB diagnostic adapter.
4. Switch on the voltage supply of the controller.

– Connect mains voltage.

When the green LED "DRV-RDY" is blinking and the red LED "DRV-ERR" is off, the controller

is ready to start and you can continue with the commissioning.

Mode

Description

Automatic

In the automatic mode a sequence runs over an infinite loop.

Selection:

When the drive is referenced...

1.Travel to Position 1,

2.Travel to Position 2,

3.Start at (1.) again.

Manual

In manual mode, the controller can be actuated by setting the individual

control bits manually (Jog1, Jog2, QSP, ErrorReset...). Like this, the controller

can be actuated in manual mode, for instance for cleaning or changing the

tools.

Service

The service mode serves to adjust the controller.

Selection:

• Travel in positive direction for one second,

• Stop for one second,

• Travel in negative direction for one second.

Homing

In the homing mode the drive is referenced.

• Either the home position is set directly, or a homing is started.

Read the mounting instructions supplied with the controller first before you start

working!
The mounting instructions contain safety instructions which must be observed!

Advertising