6 interface assignment in the »engineer, Interface assignment in the »engineer, Plc designer v2.x| lenze application samples – Lenze PLC Designer V2.x User Manual

Page 80

Advertising
background image

PLC Designer V2.x| Lenze Application Samples

Working with the sample projects

8400 HighLine - "LAS_40_INTF_Can_84HL_TabPos" sample project

80

L

1.3 EN - 07/2012

8.2.6

Interface assignment in the »Engineer«

CAN monitoring is activated in the project:

[8-8]

Time monitoring RPDO 1- RPDO4 3000 ms, "Error" response in the controller

The second SDO (code C00366) is activated for communication.

[8-9]

Assignment of the digital inputs

[8-10] Assignment of the digital outputs

LS_DigitalInput_bIn1 = bQSP

LS_DigitalInput_bIn3 = LP_CanOut1.bState_B13 and

LA_TabPos.LimitSwitchPos

LS_DigitalInput_bIn4 = LP_CanOut1.bState_B12 and

LA_TabPos.LimitSwitchNeg

All digital inputs (apart from bCInh) are

high active.

All digital outputs are high active.

Advertising