2 commissioning steps (overview), Commissioning steps (overview), Commissioning – Lenze ECSCAxxx User Manual

Page 103

Advertising
background image

Commissioning

Commissioning steps (overview)

6

l

103

EDBCSXA064 EN 3.2

6.2

Commissioning steps (overview)

Start

Create a new project with the Drive PLC Developer

Studio (DDS) and load it into the ECSxA... axis module

,

DDS Manuals:

– Introduction in the IEC 61131−3 programming
– Getting started
– Reference Manual

Make the basic settings using the parameter setting

program Global Drive Control (GDC).

(

^ 104)

l

Switch on the mains.

l

Enable controller (

^ 141).

l

Save parameters in the controller with C0003 = 1.

l

Save parameter set with GDC in the parameter set
file.

Optimise

drive behaviour

(

^ 141)

l

Save parameters in the controller with C0003 = 1.

l

Save parameter set with GDC in the parameter set
file.

End