Configuring a daily deployment schedule, Configuring a weekly deployment schedule – Brocade Network Advisor IP User Manual v12.3.0 User Manual

Page 1262

Advertising
background image

1210

Brocade Network Advisor IP User Manual

53-1003153-01

Schedule PoE power deployment

36

Configuring a daily deployment schedule

To configure a daily deployment schedule, complete the following steps.

1. Select Daily from the Frequency list.

2. Select the time of day you want deployment to run from the Time (hh:mm) lists.

Where the hour value is from 1 through 12, the minute value is from 00 through 59, and the
day or night value is AM or PM.

To finish configuring the deployment schedule, return to one of the following procedures:

To configure an enable PoE schedule, refer to

step 10

of

“Scheduling an power up

deployment”

on page 1207.

To configure an disable PoE schedule, refer to

step 10

of

“Scheduling a power down

deployment”

on page 1212.

To update a PoE schedule, refer to

step 10

of

“Updating a power deployment schedule”

on

page 1213

Configuring a weekly deployment schedule

To configure a weekly schedule, complete the following steps.

1. Select Weekly from the Frequency list.

2. Select the time of day you want deployment to run from the Time (hh:mm) lists.

Where the hour value is from 1 through 12, the minute value is from 00 through 59, and the
day or night value is AM or PM.

3. Select the day you want deployment to run from the Day of the Week list.

To finish configuring the deployment schedule, return to one of the following procedures:

To configure an enable PoE schedule, refer to

step 10

of

“Scheduling an power up

deployment”

on page 1207.

To configure an disable PoE schedule, refer to

step 10

of

“Scheduling a power down

deployment”

on page 1212.

To update a PoE schedule, refer to

step 10

of

“Updating a power deployment schedule”

on

page 1213

Advertising