Schedule PoE power deployment

36

Scheduling a power down deployment

To schedule a power down deployment on one or more PoE-capable ports, complete the following
steps.

1. Select Monitor > Power Center.

The Power Center dialog box displays.

2. Select PoE Products from the View list.

3. Select a port, product, port group, or product group in the PoE Product list and click Schedule

PoE On/Off.

The Schedule PoE On/Off dialog box displays.

4. (Ports only) Select a port from the Port list.

5. Enter a name for the schedule in the Schedule Name field.

6. Enter a description for the schedule in the Description field.

7. Select the Enable check box to enable the schedule.

8. Select the PoE Off option.

9. Choose one of the following options to configure the frequency at which deployment runs for

the schedule:

To configure deployment to run only once, refer to

“Configuring a one-time deployment

schedule”

on page 1209.

To configure hourly deployment, refer to

“Configuring an hourly deployment schedule”

on

page 1209.

To configure daily deployment, refer to

“Configuring a daily deployment schedule”

on

page 1210.

To configure weekly deployment, refer to

“Configuring a weekly deployment schedule”

on

page 1210.

To configure monthly deployment, refer to

“Configuring a monthly deployment schedule”

on page 1211.

To configure yearly deployment, refer to

“Configuring a yearly deployment schedule”

on

page 1211.

10. Click Add.

11. Click Close to close the Schedule PoE On/Off dialog box.

12. Click Close to close the Power Center dialog box.