Commissioning

8200SHB0199

5-19

Sensor connection

3-phase pressure sensor

+ -

7

8

+

-

~

2



‚

ƒ

1.DC mains supply, e.g. 24 V
2.Pressure sensor

0 - 10 V (jumper 1-2)
0 - 20 mA (jumper 5-6)
4 - 20 mA (jumper 5-6, C034 = 1)

3.Controller

2-phase pressure sensor

+ -

7

8

+

-

~

2



‚

ƒ

1.DC mains supply, e.g. 24 V
2.Pressure sensor

4 - 20 mA (jumper 5-6, C034 = 1)
250 R load

3.Controller

3-phase pressure sensor with supply via controller

28

20

39

7

8

+

-



‚

RFR

Vcc

GND 2

GND 1

1.Pressure sensor

4 - 20 mA (jumper 5-6, C034 = 1)
250 R load

2.Controller

Note:
Since terminal 20 can be loaded with max.
20 mA, the digital inputs
E1 ... E4 must not be addressed.

Application FIG 5-2:

A centrifugal pump is used to ensure constant pressure in a pipeline system (e.g.
for water supply of residential and industrial premises).

The application does not only require remote control from a central operating panel
but also setting possibilities at site. The pressure is to be reduced to a fixed value
during times when only few water is required. Thus, indirectly possible burst pipes
can be detected by monitoring the actual pressure.