F.1 APOGEE FLN Set-Up

A Yaskawa America, Inc. representative is responsible for proper configuration of the Bypass for its primary application,

while a Siemens Building Technologies, Inc. representative is responsible for field panel programming to make use of the

Bypass functionality in the building automation system. As such, there must be coordination between the Yaskawa America

and Siemens Building Technologies representatives to ensure that the programming of the drive is consistent with the particular

application requirements. After verifying that the drive installation and wiring are correct, apply power to the drive.

Table F.

1

lists the parameters and their values required for proper APOGEE FLN communication and control.

u

Bypass Parameter Settings for APOGEE FLN Communications

Table F.1 Drive Communication Parameter Settings

Parameter Number

Digital Operator Display

Settings for APOGEE FLN Communication

Z1-07

Reference Source

2: Serial Com

Z1–08

Run Source

2: Serial Com

Z3–02

Serial Comm Adr

Select the Bypass address

Z3–03

Serial Baud Rate

2: 4800 Baud

Z3–01

Protocol Select

2: P1

NOTICE: A Yaskawa representative should set the drive parameters to their appropriate values. Changes made to the parameters other

than what is listed in the table above can result in damaging the drive or building equipment.