Melsec-q, 8 opr control, Operation timing and processing time of fast opr – MITSUBISHI ELECTRIC Mitsubishi Programmable Logic Controller QD75D User Manual

Page 299: Operating restrictions

Advertising
background image

8 - 21

MELSEC-Q

8 OPR CONTROL

Operation timing and processing time of fast OPR

The following shows details about the operation timing and time during fast OPR.

t1

t3

t2

In position control

Standing by

Standing by

Positioning start signal

BUSY signal

Start complete signal

Output pulse to external source
(PULSE)

Positioning operation

Md.26 Axis operation status

[Y10,Y11,Y12,Y13]

[X10,X11,X12,X13]

[XC,XD,XE,XF]

Fig. 8.17 Operation timing and processing time of fast OPR

Normal timing time Unit: ms

t1

t2

t3

1.0 to 1.3

2.7 to 4.4

0 to 1.8

The t1 timing time could be delayed by the operation state of other axes.

Operating restrictions

When the OPR complete flag (

Md.31

Status: b3) is ON, executing a fast OPR start

will result in an error "OPR request ON" (error code: 207)".

Advertising