Melsec-q, 10 high-level positioning control, Start time chart – MITSUBISHI ELECTRIC Mitsubishi Programmable Logic Controller QD75D User Manual

Page 439

Advertising
background image

10 - 25

MELSEC-Q

10 HIGH-LEVEL POSITIONING CONTROL

Start time chart

The following chart shows a time chart in which the positioning data No. 1, 2, 10,
11, and 12 of axis 1 are continuously executed as an example.

(1) Block start data setting example

Axis 1 block

start data

Da.11

Shape

Da.12

Start data No.

Da.13

Special start

instruction

Da.14

Parameter

1st point

1: Continue

1

0: Block start

2nd point

0: End

10

0: Block start


(2) Positioning data setting example

Axis 1 position-

ing data No.

Da.1

Operation pattern

1

11: Continuous path control

2

00: Positioning complete

10

11: Continuous path control

11

11: Continuous path control

12

00: Positioning complete

(3) Start time chart

[Y10]

PLC READY signal

QD75 READY signal

[X10]

[XC]

Positioning complete signal

V

t

Error detection signal

Positioning data No.

Dwell time

12(00)

Operation pattern

1(11)

1st point [buffer memory address 26000]

2nd point [buffer memory address 26001]

11(11)

10(11)

2(00)

7000

1

-32767

10

(8001

H

)

(000A

H

)

Cd.3 Positioning start No.

Cd.4 Positioning start point No.

Positioning start signal

[X0]

Start complete signal

BUSY signal

[X8]

[X14]

[Y0]

Dwell time

Fig. 10.3 Start time chart for high-level positioning control (block start)

Advertising