Melsec-q, 9 major positioning control – MITSUBISHI ELECTRIC Mitsubishi Programmable Logic Controller QD75D User Manual

Page 393

Advertising
background image

9 - 93

MELSEC-Q

9 MAJOR POSITIONING CONTROL

Operation timing and processing time during speed-position switching

control (ABS mode)

Positioning start
signal [Y10,Y11,Y12,Y13]

BUSY signal

M code ON signal
[X4,X5,X6,X7](WITH mode)

Standing by

In speed control

Start complete signal

Output pulse to external source
(PULSE)

Positioning operation

Positioning complete signal

M code ON signal (AFTER mode)

t1

t2

t3

t4

t5

t2

t7

In position control

Speed
control

Position
control

External speed-position
switching command

t6

Speed control carried out until speed-position switching

signal turns ON

Md.26 Axis operation status

OPR complete flag
Md.31 Status: b4

Cd.7 M code OFF request

Cd.7 M code OFF request

Standing by

[XC,XD,XE,XF]

[X10,X11,X12,X13]

[X14,X15,X16,X17]

[X4,X5,X6,X7]

Fig. 9.17 Operation timing and processing time during speed-position switching control (ABS mode)

Normal timing time Unit: ms

t1

t2

t3

t4

t5

t6

t7

1.1

0 to 1.8

0 to 1.8

2.7 to 4.4

0 to 1.8

1.0

Follows parameters

The t1 timing time could be delayed by the operation state of other axes.

Advertising