11 - 29

MELSEC-Q

11 MANUAL CONTROL

Manual pulse generator operation timing and processing time

The following drawing shows details of the manual pulse generator operation
timing and processing time.

Manual pulse generator input
pulses

BUSY signal [XC,XD,XE,XF]

Start complete signal

[X10, X11, X12, X13]

Pulse output to an external
source (PULSE)

Positioning operation

Cd. 21 Manual pulse generator
enable flag (axis control data)

Md. 26 Axis operation status

t1

t3

t4

Standing by

t2

0

0

1

Standing by

In manual pulse generator operation

The start complete signal does not turn ON in manual pulse generator operation.

Fig. 11.19 Manual pulse generator operation timing and processing times

Normal timing times Unit : ms

t1

t2

t3

t4

0 to 2.6

6.2 to 32

64 to 90

28.4 to 57.6

Delays may occur in the t1 timing time due to the operation status of other axes.