Startup and test – Toshiba H9 User Manual

Page 35

Advertising
background image

H9 ASD Installation and Operation Manual

27

Startup and Test

Before turning on the ASD ensure that:

R/L1, S/L2, and T/L3 are connected to the 3-phase input power.

U/T1, V/T2, and W/T3 are connected to the motor.

• The 3-phase input voltage is within the specified tolerance.

• There are no shorts and all grounds are secured.

• All personnel are at a safe distance from the motor and the motor-driven equipment.

Advertising