6 commissioning, 1 before you start, Commissioning – Lenze ECSCSxxx User Manual

Page 93: Before you start

Advertising
background image

Commissioning

Before you start

6

l

93

EDBCSXS064 EN 4.0

6

Commissioning

6.1

Before you start

)

Note!

ƒ

The use of a Lenze motor is assumed in this description of the
commissioning steps. For details on the operation with other motors see

^ 145.

ƒ

The operation with the Lenze parameter setting and operating program
"Global Drive Control (GDC)" is taken as a basis. The parameters are
displayed in the online mode, i.e. GDC can directly access the codes of the
axis module.

Prior to initial switch−on of the drive system, check the wiring for completeness,
short−circuit, and earth fault:

ƒ

Power connection:
– Polarity of the DC−bus voltage supply via terminals +UG, −UG

ƒ

Motor connection:
– In−phase connection to the motor (direction of rotation)

ƒ

Wiring of "safe torque off" (formerly "safe standstill")

ƒ

Feedback system

ƒ

Control terminals:
– Wiring adjusted to the signal assignment of the control terminals.

Advertising
This manual is related to the following products: