2 commissioning steps (overview), Commissioning steps (overview), Commissioning – Lenze ECSCSxxx User Manual

Page 94

Advertising
background image

Commissioning

Commissioning steps (overview)

6

l

94

EDBCSXS064 EN 4.0

6.2

Commissioning steps (overview)

Start

Carry out

basic settings

(

^ 95)

Select

operating mode/control structure

(

^ 126)

Set machine parameters for

speed control

(

^ 141)

Set machine parameters for

torque control

(

^ 141)

l

Switch on the mains.

l

Enable controller (

^ 154).

l

Save parameters in the controller with
C0003 = 1.

l

Save parameter set with GDC in the
parameter set file.

Optimise

drive behaviour

(

^ 154)

l

Save parameters in the controller with
C0003 = 1.

l

Save parameter set with GDC in the
parameter set file.

End

Advertising
This manual is related to the following products: