6 system, 1 commit and reboot – Planet Technology IP DSLAM IDL-4801 User Manual

Page 61

Advertising
background image

IP DSLAM

61

3.6 System

This section allows users to perform commit and reboot that will be introduced as follows.

3.6.1 Commit and Reboot

This section describes how to commit the current configuration to flash or reboot the IP

DSLAM. Double Click on “Commit and Reboot” from the Function List Window. The

System Information screen appears as follows.

a. If to commit the active configuration to the flash, click on

.

b. If to reboot the system and to set the boot configuration, click on

.

c. Click on

to close the window.

Advertising
This manual is related to the following products: