69 samil power, 69�1 samil power – Solare Datensysteme Solar-Log User Manual

Page 195

Advertising
background image

195

Samil Power

Samil Power

69 Samil Power

69�1 Samil Power

Easy Installation

Termination

Addressing

Interface

No

-

No

RS422

Overview

Integrated interface

2 RJ11 sockets inside the inverter.

4-pin wiring

Communication address does not have to be assigned

Note

Only connect inverter using the RS485/422 B/C interface.

Installation steps

Switch off the inverters and Solar-Log™

Connect inverters to the Solar-Log™

Connect the inverters to each other

Connect inverters to the Solar-Log™�

The wiring is done using a

ready-made data cable (optional extra; not supplied)

self-made, shielded 4 wire data cable and terminal block connector.

Procedure

1.

Open the inverter as shown in the inverter's instructions.

2. If you are making the cable yourself, connect the wires as shown in the following diagram

Solar-Log™ terminal strip con-

nector

Inverter SolarRiver*

Inverter SolarLake

RS485/422 B

RJ 11 socket

RJ45 socket

► 1

► 2 R+

► 3 R+

► 4

► 1 R-

► 6 R-

► 5

► 4 T+

► 1 T+

► 6

► 3 T-

► 2 T-

*Some of the SolarRiver models use the same connection as SolarLake. Setup the wiring accoring to Solar-

Lake in this case.

Advertising