72�2 ipe ct series – Solare Datensysteme Solar-Log User Manual

Page 206

Advertising
background image

206

Schüco

IPE CT series

72�2 IPE CT series

Easy Installation

Termination

Addressing

Interface

No

DIP switch

Yes

RS485

Selectable under Bonfiglioli

Overview

Integrated interface.

Where to connect: Terminal strip inside the inverter.

3-pin wiring.

Communication address must be allocated.

Installation steps

Switch off the inverters and Solar-Log™.

Connect inverters to the Solar-Log™.

Connect the inverters to each other.

Allocate communication address.

Connect inverters to the Solar-Log™

The wiring is done using a

self-made, shielded 3 wire data cable with a terminal block connector.

Procedure

1.

Get access to the inverter interface

2. If you are making the cable yourself, connect the wires as shown in the following diagram:

Solar-Log™ terminal strip connector

Terminal strip inside the inverter

Terminal

RS485 terminal

► 1

► 1 A (Data+)

► 3

► 6 GND

► 4

► 3 B (Data-)

3. If only one inverter is to be connected this must be terminated.

In the inverter, set the DIP switch S1 for the terminal resistor to ON.

4. Insert the terminal block connector into the Solar-Log™ RS485 socket.

Connect the inverters to each other

Where to connect: Terminal strip on the inverter

3-pin wiring

Advertising