72 schüco, 72�1 ipe cn series – Solare Datensysteme Solar-Log User Manual

Page 204

Advertising
background image

204

Schüco

IPE CN series

72 Schüco

72�1 IPE CN series

Easy Installation

Termination

Addressing

Interface

Yes

Terminating plug

Yes

RS485

Selectable under RefuSol

Overview

Integrated interface.

Where to connect: RJ45 socket on the bottom of the inverter.

2-pin wiring.

Communication address must be allocated.

Installation steps

Switch off the inverters and Solar-Log™.

Connect inverters to the Solar-Log™.

Connect the inverters to each other.

Allocate communication address.

Note

To use active and reactive power management, all of the inverters need to be set to:

Protocol 1

57600 baud

Parameter 1164 = 2

Connect inverters to the Solar-Log™

The wiring is done using a

self-made, shielded 2 wire data cable and terminal block connector.

Procedure

1.

Connect wires as shown in the diagram below.

Solar-Log™ terminal strip connector

RS485 inverter socket

Terminal

PIN

► 1

► 2

► 4

► 3

2. If only one inverter is to be connected this must be terminated.

On the sockets „RS485 OUT“ with REFUSOL round plugs bypass the connections PIN1 to PIN2 and

PIN3 to PIN4.

3. Close the inverter if no other inverters are to be connected.

Advertising