Solare Datensysteme Solar-Log User Manual

Page 300

Advertising
background image

300

Würth

Würth SolarStar-Series

Procedure

1.

If you are making the cable yourself, connect the wires as shown in the following diagram:

Solar-Log™ terminal strip connector

RJ45 inverter

Terminal

PIN

► 1

► 7

► 4

► 8

2. Insert the RJ45 plug into any RJ45 socket on the first inverter.
3. Insert the terminal block connector into the Solar-Log™ RS485 socket.

Connect the inverters to each other

Connect using the RS485 data cable with an RJ45 plug

Where to connect: RJ45 socket on the outside of the inverter

Procedure

1.

Insert the RJ45 plug into the free RJ45 socket on the first inverter.

2. Insert the other end of the wire into any RJ45 socket on inverter 2.

3. Connect the other inverters to each other in the same way.

Allocate communication address

Recommendation: Continuous numbering starting with 1.

Setting: Using the inverter operating display

Procedure: Start according to the inverter‘s instructions

Advertising