3 abb – Solare Datensysteme Solar-Log User Manual

Page 20

Advertising
background image

20

ABB

ABB PVS300

3 ABB

3�1

ABB PVS300

Easy Installation

Termination

Addressing

Interface

No

Yes

Yes

RS485

Select “ABB-PVS” during the inverter detection

Overview

Where to connect: X4 terminal block under the cover.

Communication address must be allocated.

3-pin wiring

Installation steps

Switch off the inverters and Solar-Log™

Connect inverters to the Solar-Log™

Connect the inverters to each other

Connect inverters to the Solar-Log™

The wiring is done using a

self-made cable connection with terminal block connector.

Procedure

1.

Unscrew the side cover as shown in the inverter's instructions.

2. If you are making the cable yourself, connect the wires as shown in the following diagram:

Solar-Log™ terminal strip connector

X4 terminal block inverter

Terminal

PIN

► 1

1 - Data+

► 3

3 - GND

► 4

2 - Data-

3. If only one inverter is to be connected, according to the manufacturer's handbook it must be termina-

ted.

4. Screw the inverter cover on again.

5. Insert the terminal block connector into the Solar-Log™ RS485 socket.

Connect the inverters to each other

Where to connect: X4 terminal block under the cover.

Advertising