Solare Datensysteme Solar-Log User Manual

Page 235

Advertising
background image

235

SolarEdge

SolarEdge

Procedure

1.

Open the inverter as shown in the inverter's instructions.

2. Pull the free wires through the wire opening in the inverter.

3. If you are making the cable yourself, connect the wires as shown in the following diagram:

Solar-Log™ terminal strip connector

X4 socket RS485-1 inverter

Terminal

PIN

► 1

A - Data+

► 3

G - GND

► 4

B - Data-

4. If only one inverter is to be connected, it must be terminated with DIP switch SW7 according to the

manufacturer's instructions.

5. Screw the inverter cover on again.

6. Insert the terminal block connector into the Solar-Log™ RS485 socket.

Connect the inverters to each other

Where to connect: Terminal strip inside the inverter

Procedure

1.

Open the inverter as shown in the inverter's instructions.

2. Pull the free wires through the wire opening in the inverter.

3. If you are making the cable yourself, connect the wires as shown in the following diagram:

X4 socket RS485-2 inverter n

X4 socket RS485-1 inverter n+1

PIN

PIN

A - Data+

A - Data+

G - GND

G - GND

B - Data-

B - Data-

4. Connect the other inverters to each other in the same way.

5. Terminate the last inverter with DIP switch SW7 according to the manufacturer's instructions.

6. Screw the inverter cover on again.

7. Insert the terminal block connector into the Solar-Log™ RS485 socket.

Allocate communication address

Recommendation: Continuous numbering starting with 1; highest possible address: 247.

Setting: Using the inverter operating display

Procedure: Start according to the inverter's instructions

Inverter settings

Two settings need to be checked on the inverter's control panel and changed if needed before performing

the inverter detection.

1.

Non-SE Logger

has to be set in the

Communication // RS485-1 Conf // Device Type

menu.

2.

SunSpec

has to be activated in the

Communication // RS485-1 Conf // Protocol

menu.

Advertising