Solare Datensysteme Solar-Log User Manual

Page 93

Advertising
background image

93

EKO Energy

EKO Energy

Procedure

1.

Insert the round plug into any round socket on inverter 1.

2. Insert the other end of the cable into any round socket on inverter 2.

3. Connect the other inverters to each other in the same way.

4. Terminate in the last inverter according to the inverter instructions.

Allocate communication address

Recommendation: Continuous numbering starting with 1.

Default settings on the inverter: Communication address 1

Setting: Using the inverter operating display

Procedure: Start according to the inverter's instructions

Advertising