2 preparation (step 1), 1 wiring, 1 ) system layout model – Yaskawa MP2300S Basic Module User Manual

Page 119: System start up and easy programming, Mechatrolink cable, Vdc power supply, Option

Advertising
background image

4.2 Preparation (step 1)

4.2.1 Wiring

4-3

System Start Up and Easy Programming

4.2 Preparation (step 1)

This section explains the steps of “wiring,” “self-configuration,” and “test operation” for starting up the model system.

4.2.1 Wiring

We use the following layout model to explain the startup of the model system. Prepare each device listed on the next
page and connect them as shown in the figure below.

( 1 ) System Layout Model

Personal computer (equipped with MPE720)

SERVOPACK SERVOPACK

YASKAWA SERVOPACK

200V

SGDS-A5F12A

SW1

CHARGE

C
N
3

A/B

C
N
1

C
N
2

C
N
4

L1

L2

L2C

L1C

B1/

B2

U

V

W

C
N
6

YASKAWA SERVOPACK

200V

SGDS-A5F12A

SW1

CHARGE

C
N
3

A/B

C
N
1

C
N
2

C
N
4

L1

L2

L2C

L1C

B1/

B2

U

V

W

C
N
6

MECHATROLINK cable

MECHATROLINK
cable

Servomotor

Servomotor

Terminator

(terminating resistor)

100 VAC

HUB

Controller

Motor
cable

Encoder
cable

PP cable

&%

4.;

176 'VJGTPGV

&%

8

.+0-

/

0V

MP2300S

Option

;#5-#9#

6'56

4&;

#./

/6:

64:

470

'44

$#6

+2

59



59



/10

%0()

+06

572

5612

$#66'4;

㪧㪦㪮㪜㪩

'

M-

I/II

+0+6

01

01

'6'56

24-VDC

power supply

Advertising