Commissioning steps – Efficient Networks Siemens Sinamics S120 User Manual

Page 43

Advertising
background image

Infeed

1.4 Line contactor control

Drive Functions
Function Manual, (FH1), 07/2007 Edition, 6SL3097-2AB00-0BP4

43

Example of commissioning line contactor control

Assumption:

● Line contactor control via a digital output of the Control Unit (DI/DO 8)
● Line contactor feedback via a digital input of the Control Unit (DI/DO 9)
● Line contactor switching time less than 100 ms

/LQHFRQWDFWRU

FORVHG

1ROLQH

FRQWDFWRU

IHHGEDFN

)DXOW

/LQHFRQWDFWRU
IHHGEDFN

/LQHFRQWDFWRUHQHUJL]HG

/LQHFRQQHFWLRQ

$FWLYH/LQH0RGXOH

$VRXWSXW

!1RWHWKHFXUUHQWFDUU\LQJ
FDSDFLW\RIWKHRXWSXWV$QDX[LOLDU\
FRQWDFWRUPD\KDYHWREHXVHG







7

)



PV

S 



9

;

;

S 

S

/

/

/

S 

U

','2

','2

S 

!

Figure 1-10 Line contactor control

Commissioning steps:

● Connect the line contactor control contact to DI/DO 8.

Note
Note the current carrying capacity of the digital output (see the Equipment Manual). A line

contactor may have to be used.

● Parameterize DI/DO 8 as an output (p728.8 = 1).
● Assign p0738 the control signal for the line contactor r0863.1.
● Connect the line contactor feedback contact to DI/DO 9.
● Assign p0860 an inverted input signal r0723.9.
● Enter the monitoring time for the line contactor (100 ms) in p0861.

Advertising