Yaskawa J50M Instructions User Manual

Page 204

Advertising
background image

7. MAINTENANCE

7.1

INSPECTION SCHEDULE

The following describes the requirements to be observed

for maintenance according to time in order to keep the
equipment in optimum condition for extended period.

Except for those checks which can be made with the NC
energized, such as checks for external cleanliness for

vibration and for noise, be sure to turn off the power

supply to the NC before starting to undertake routine
maintenance service.

For this, turning off the power supply by pushing the

POWER OFF button on the NC operator’s panel is not
sufficient, because after this button is pushed, several
areas in the housing are

and are potentially

dangerous. If power supplied to the NC is cut off, all fans
in the unit are stopped.

7.1.1

CONTROL PANEL

(1) Doors are completely closed. (Daily)

(a) The unit is of a totally-enclosed type and designed to
prevent the outside air containing oil mist, etc. will not
enter the panel.

Be sure to close the doors of the control

panels at any time other than during operation.

(b) When it is necessary to open/close the doors for
maintenance, lock the doors by turning two door locks

with the key (model :

YEOO 1) attached to the control

panel. When opening or closing the doors, insert the key
and press and turn it

it stops.

The key can be removed in either position of open or

closed.

CLOSED
POSITION

CLOSED

OPEN POSITION

With the door

lock on right

side of the

door.

OPEN POSITION

CLOSED

_ CLOSED

POSITION

With the door

lock on left

side of the

Fig. 7.1

Note : If the optional door interlocking

is

provided, opening the door shuts off the main power
supply and stops all operations.

(2) Inspection on gaps and damages in sealed structure

(a) Open each door to check that sealing packing around
the door is not damaged.

(b) Check that there is no abnormal contamination
inside of the unit. If there is, wipe it off after researching
the cause.

(c) Check that there is no gap when the door is locked
completely.
By executing the items described in this paragraph, the

NC control panel can be operated stably for a longer
period.

7.1.2 SERVOMOTOR AND DC MOTOR FOR SPINDLE

Vibration and noise. (Daily or when necessary)

Vibration can be checked by resting the
hand on the motors, and for noise, using a
listening stick is recommended. If any ab-
normality is found, contact maintenance per-
sonnel immediately.

2.

Motor contamination and impairment. (Daily or

when necessary)

Check the motor exterior visually. If dirt or damage
should be observed, inspect the motor by removing
the machine cover. Refer to the machine tool
builder’s manual.

7.1.3 BATTERY

Make sure that

or

on the right-low

position of CRT screen is not displayed. If it is
displayed, inform maintenance personnel.

The

battery must

replaced with a new one within a

month.

7.2

REPLACEMENT

The battery is used as power source for memory
in order to prevent programming g data stored in
memory , such as parameter , tool offset and part
program from erasing .

When the battery is discharged after a long period
of use, “BAT” or “A/B” is blinked on CRT screen

to give warning for replacement. On such occa-
sions, the battery must be replaced within 30
days.

When replacing , never

remove the old

battery with power off, otherwise the data stored
in memory may be cleared.

Commercially sold batteries cannot be used ; contact

your Yaskawa representative before replacement of
batteries.

Replacing Procedure

1.

2.

Depress POWER OFF pushbutton.

When door interlock switch provided

Open the front door and

out the door interlock

196

Advertising