Yaskawa J50M Instructions User Manual

Page 228

Advertising
background image

PARAMETER NUMBERS AND THEIR CONTENTS

DO 1:

Operation confirmation of each unit is
not performed during system operation.

o:

Operation confirmation of each unit is

performed during system operation.

Notes :

1. Normal

setting is “O”.

2. When these parameters are changed, be sure to

turn the power off and on.

I

D3

DO

X - a x i s

D7, D6

X-axis Circular Projection Compensation

D7

I

D6

o

None

1

Provided

D3 to DO

I

x l

o

o

1

,

x 2

0

x 4

o

1

0

0

X

8

1

o i o

o

Note

Be sure to turn the power on and off after chang-

ing the parameter.

D2

DO

Y-axis

D7, D6

Y-axis Circular Projection Compensation

D7

D6

I

Compensation

o

0

I

None

1

0

Provided

D3 to DO

Set the magnification of the feedback pulse input to

the NC unit.

D3

DO

Note : Be sure to turn the power on and off after chang-

ing the parameter.

z - a x i s

D7, D6

Z-axis Circular Projection Compensation

D7

D6

I

Compensation

o

None

1

0

I

Provided

D3 to DO

Set the magnification of the feedback pulse

the NC unit.

D3

D2

DO

input to

Note : Be sure to turn the power on and off after
changing the parameter.

#6061

4th axis spindle

D3 to DO : Set

I

D2

DO

D3

‘2

Go

the magnification of the feedback pulse

input to the NC unit.

D3

D2

DO

o

0

0

1

o

0

1

0

o

1

0

0

X

8

1

0

0

0

Note:

Be sure

to

turn the power on and off

after changing the parameter.

220

Advertising