2 initialisation, Initialisation, Commissioning – Lenze EPM−T9XX Modular system User Manual

Page 292: Profibus−dp initialisation

Advertising
background image

PROFIBUS−DP

Initialisation

11

Commissioning

11.2

11.2.2

L

11.2−2

EDSPM−TXXX−9.0−11/2009

11.2.2

Initialisation

After the supply voltage has been connected, the initialisation of PROFIBUS
Gateway or PROFIBUS GatewayECO starts:

l

The internal functions of the module and the communication via the
backplane bus are checked.

l

If communication faults occur on the backplane bus, the module changes
into the "STOP" state. After approx. 2 seconds, the initialisation is started
again.

"STOP" status

PROFIBUS master sets

outputs to "0" and accepts

the set device address

PROFIBUS master

receives projected data

from master

Does the projected

data correspond to the

configuration?

Incorrect

parameter

setting?

Incorrect

configuration?

LED "ER" on

LED "PW" on

Enable inputs and

outputs

Initialisation

Switch on supply voltage

Data exchange

"READY" status

LED "ER" goes off

LED "RD" is blinking

"DataExchange" status

LED "RD" on
LED "DE" on

LED "ER" and LED "PW"

are blinking

synchronously

LED "ER" and LED "PW"

are blinking

asynchronously

Yes

No

No
No

Yes

Yes

EPM−T220

Fig. 11.2−1

Initialisation process