PROFIBUS GatewayECO

4

The modular system

4.4

L

4.4−2

EDSPM−TXXX−9.0−11/2009

View

Pin

Assignment

Explanation

1

2

3

4

5

6

7

8

9

1

Not assigned

2

Not assigned

3

RxD/TxD−P

Data line B (received / transmitted data plus)

4

RTS

Request To Send (received / transmitted data, no differential
signal)

5

M5V2

Data ground (ground at 5 V)

6

P5V2

DC 5 V / 30 mA (bus termination)

7

Not assigned

8

RxD/TxD−N

Data line A (received / transmitted data minus)

EPM−T223

9

Not assigned

Coding
switch

64
32
16
8
4
2
1

1

0

...

Device address

1

2

3

4

5

6

7

...

125

l

Set the device address for the module with the coding switch.

– Allowed device addresses are 1 ... 125.

– Every device address must only be assigned once on the bus.

– Changes to the device address are only adopted when the supply voltage

is switched on again.

LED

Status

Meaning

PW (green)

on

Module supply voltage on

ER (red)

on

·

Incorrect data transmission on the backplane bus.

·

Internal fault

·

Lights up for approx. 1 second when the module is restarted

RD (green)

See table below

DE (green)

on

Error−free communication with PROFIBUS−DP

PW (green)

ER (red)

RD (green)

DE (green)

Meaning

on

on

off

off

Self−test and initialisation in progress

on

off

blinking

off

Self−test and initialisation was successful

on

blinking

off

off

Initialisation error

on

blinking

blinking

off

·

"ER" and "RD" blink asynchronously:

– Configuration faulty

·

"ER" and "RD" blink synchronously:

– Parameter settings faulty

on

off

on

on

The backplane bus cycle is quicker than the
PROFIBUS cycle

on

off

off

on

The backplane bus cycle is slower than the
PROFIBUS cycle