The modular system, Can gatewayeco – Lenze EPM−T9XX Modular system User Manual

Page 37

Advertising
background image

CAN GatewayECO

4

The modular system

4.2

L

4.2−3

EDSPM−TXXX−9.0−11/2009

64
32
16
8
4
2
1
L/C

1

0

L/C

L/C

1

1

0

0

0

1

epm−t231

Fig. 4.2−2

Set the communication protocol for the CAN GatewayECO

0

System bus (CAN)

1

CANopen

)

Note!

Changes to the communication protocol are only adopted when
the supply voltage is switched on again.

LED

Status

Meaning

PW (yellow)

on

Module supply voltage on

ER (red)

on

Incorrect data transmission on the backplane bus.

RD (green)

on

Signals error−free data transmission on the backplane bus.

See table below

BA (yellow)

See table below

PW (yellow)

ER (red)

RD (green)

BA (yellow)

Meaning

on

off

blinking (1 Hz)

off

Self test and initialisation in progress

on

off

on

on

System bus (CAN)/CANopen in the
"Operational"state

on

off

on

blinking (1 Hz)

System bus (CAN)/CANopen in the
"Pre−Operational"state

on

off

on

blinking (10 Hz)

System bus (CAN)/CANopen in the
"Stopped"state

on

blinking (10 Hz)

on

on

blinking (1 Hz)

blinking (10 Hz)

System bus (CAN)/CANopen "Offline"state

on

blinking (1 Hz)

on

System bus (CAN)/CANopen "Warning"state

on

on

on

on

Error during RAM or EEPROM initialisation

on

blinking (1 Hz)

blinking (1 Hz)

blinking (1 Hz)

Baud rate setting mode active

on

blinking (10 Hz) blinking (10 Hz) blinking (10 Hz) Error during baud rate setting

on

off

blinking (1 Hz)

off

Address setting mode active

)

Note!

NMT telegrams for changing to the different states can be found in
the chapter "Networking via system bus (CAN)" or "Networking via
CANopen".

Setting the communication
protocol

Status displays

Advertising