3 parts replacement schedule, 3 parts replacement schedule -23 – Yaskawa SGDH Linear Sigma Series User Manual

Page 375

Advertising
background image

11.2 Inspection and Maintenance

11-23

11

11.2.3 Parts Replacement Schedule

The following electric or electronic parts are subject to mechanical wear or deterioration over time. To avoid
failure, replace these parts at the frequency indicated.

The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the factory settings before ship-
ping. Be sure to confirm that the parameters are properly set before starting operation.

Table 11.10 Periodical Part Replacement

Part

Standard

Replacement

Period

Replacement Method

Operating Conditions

Cooling Fan

4 to 5 years

Replace with new part.

• Ambient Temperature: Annual

average of 30

°C

• Load Factor: 80% max.
• Operation Rate: 20 hours/day

max.

Smoothing Capacitor

7 to 8 years

Test. Replace with new part if nec-
essary.

Relays

Test. Replace if necessary.

Fuses

10 years

Replace with new part.

Aluminum
Electrolytic
Capacitor on Circuit
Board

5 years

Test. Replace with new circuit
board if necessary.

Advertising