E.1 APOGEE FLN Set-Up

A Yaskawa America representative is responsible for proper configuration of the Bypass for its primary application, while a

Siemens Building Technologies representative is responsible for field panel programming to make use of the Bypass

functionality in the building automation system. As such, there must be coordination between the Yaskawa America and

Siemens Building Technologies representatives to ensure that the programming of the drive is consistent with the particular

application requirements. After verifying that the drive installation and wiring are correct, apply power to the drive.

Refer to

Drive Communication Parameter Settings on page 404

lists parameters and values required for proper APOGEE FLN

communication and control.

u

Z1000 Bypass Parameter Settings for APOGEE FLN Communications

Table E.1 Drive Communication Parameter Settings

Parameter Number

Digital Operator Display

Settings for APOGEE FLN Communication

Z1-07

Reference Source

2: Serial Com

Z1-08

Run Source

2: Serial Com

Z3-02

Serial Comm Adr

Select the Bypass address

Z3-03

Serial Baud Rate

2: 4800 Baud

Z3-01

Protocol Select

2: P1

NOTICE: A Yaskawa representative should set the drive parameters to their appropriate values. Changes made to the parameters other

than what is listed in the table above can result in damaging the drive or building equipment.

E.1 APOGEE FLN Set-Up

404

YASKAWA ELECTRIC SIEP YAIZ1B 01D YASKAWA AC Drive – Z1000 Bypass Technical Manual