Metrohm tiamo 2.3 (process analysis) User Manual

Page 1029

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 Method

tiamo 2.3 (for Process Analysis)

■■■■■■■■

1013

Designation

Description

.ITE

Initial temperature (temperature before start conditions
are processed) in °C

.LP.CAx

Calculated value × (1…3) for the last measuring point
on the measuring point list

.LP.EXx

External value × (1…3) for the last measuring point of
the measuring point list

.LP.MEA

Measured value for the last measuring point of the
measuring point list in the unit of the measured value

.LP.TEM

Temperature for the last measuring point of the meas-
uring point list in °C

.LP.TIM

Time in s until the last measuring point in the measur-
ing point list is reached

.MA.MEA

Maximum measured value (U

ind

) in mV

.MA.TEM

Temperature for the maximum measured value in °C

.MA.TIM

Time in s until the maximum measured value is reached

.MI.MEA

Minimum measured value (U

ind

) in mV

.MI.TEM

Temperature with minimum measured value in °C

.MI.TIM

Time for the minimum measured value in s

.MTE

Temperature measurement with sensor; 1 = on, 0 =
off
)

.NMP

Number of measuring points in measuring point list

.RTE

Reference temperature in °C

.STY

Type of stop with which the command was stopped: 1
= normal
; 0 = manual or after error

.TC.TC

Temperature coefficient in %/°C

.TC.CO

Coefficient c0 of the Chebyshev polynomial of the solu-
tion used

.TC.C1

Coefficient c1 of the Chebyshev polynomial of the solu-
tion used

.TC.C2

Coefficient c2 of the Chebyshev polynomial of the solu-
tion used

.TC.C3

Coefficient c3 of the Chebyshev polynomial of the solu-
tion used

Advertising