Metrohm tiamo 2.3 (process analysis) User Manual

Page 171

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Workplace

tiamo 2.3 (for Process Analysis)

■■■■■■■■

155

6 - Main run
The following actions may be carried out during processing of the method
loaded:

Process series start track
At the beginning of the first determination of a series the Series start
track
is started. If [Stop] is pressed during running this track, the Exit
track
is started, if an error occurs, the Error track.

Process the main track
After the start of the Main track the status switches to BUSY. The
commands of the main track and of the tracks requested by the latter
are processed in sequence. If tracks, which are not free, are requested
by the main track, waiting takes place until these tracks can be started.

Stop run and continue
A running determination can be interrupted at any time with [Hold]
and continued with [Cont]. Thereby, all active tracks are interrupted
and continued jointly.

Stop series and continue
A running series can be interrupted at any time with [Pause]. Thereby,
the ongoing determination of the sample series will still be carried out
to completion, but no new determination will be started. The next
determination of the interrupted sample series is started with [Cont].

Cancel run
A determination that is running can be interrupted at any time with
[Stop]. Afterwards the Exit track (if present) is run through and the
determination is stopped.

Stop by error
If an error, which causes the determination to be interrupted, occurs,
the Error track (if present) is run through and the determination is
stopped.

Process exit track
if the main track and all tracks requested by the latter are ended, the
Exit track (if present) is run through and the determination is stopped.

Process series end track
At the end of the last determination of a series, the series end track
is started. If [Stop] is pressed during running this track, the determina-
tion is cancelled, if an error occurs, the Error track.

7 - Post-conditioning (only for methods with conditioning)
For methods containing commands with conditioning activated and for
which the option Automatic conditioning is activated in the START
command, the post-conditioning is automatically started for all these
commands with the method loaded and this immediately after the end of
the track containing the conditioning command. The status switches to
COND BUSY after the start of the post-conditioning. In this status the
conditioning can be cancelled with [Stop] or interrupted with [Hold] and

Advertising