2 edit sample table, Edit sample table 7 – Metrohm tiamo 2.3 (process analysis) User Manual

Page 1763

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

9 How to proceed?

tiamo 2.3 (for Process Analysis)

■■■■■■■■

1747

6 In the dialog window Sample table 'New sample table', click on

the menu item Edit

Edit line.

The dialog window Edit line - Sample table 'New sample table
opens.

7 In the list box Method, select the desired method and enter sample

data.

8 Click on [Apply].

The sample data entered will be applied in the respective line of the
sample table.

9 Repeat step 6 for each desired determination.

10 Click on [Close].

The dialog window Edit line - Sample table 'New sample table'
is closed.

11 In the dialog window Sample table 'New sample table' click on

the menu item Sample table

Save as....

The dialog window Save sample table opens.

12 In the field Name enter the desired name.

13 Click on [Save].

The sample table will be saved under the name that was entered.

9.8.2

Edit sample table

How to proceed?

1 Select program part Workplace.

2 Click on the symbol or the menu item Tools Sample

table

Open….

The dialog window Open sample table opens.

3 Select desired sample table.

4 Click on [Open].

Advertising