Metrohm tiamo 2.3 (process analysis) User Manual

Page 1540

Advertising
background image

7.8 730 Sample Changer

■■■■■■■■■■■■■■■■■■■■■■

1524

■■■■■■■■

tiamo 2.3 (for Process Analysis)

Comment on GLP test

Comment on GLP test.

Input

1000 characters

Monitoring of GLP validity

Monitoring of GLP validity

on | off (Default value: off)

If this option is enabled then the time interval for the GLP test will be
monitored.

Monitoring can only be switched on when a date has been entered in
the field GLP test date.

GLP test interval

Time interval to next GLP test. If a value is entered here then the date in
the field Next GLP test will be adjusted automatically.

Can only be edited if monitoring is switched on.
Range

1 ... 999 days

Default value

999 days

Next GLP test

Date on which the next GLP test is to be carried out. The date can be

selected by pressing

in the dialog window Select date (see Chapter

2.5.1, page 89). After the date has been entered the field GLP test
interval
will be adjusted automatically.

Can only be edited if monitoring is switched on.
Default value

   GLP test date + 999 days

Message
The message options can only be edited if monitoring is switched on.

Message by e-mail

on | off (Default value: off)

If this option is activated, the message is sent to the e-mail address
defined under [E-mail...]. The message is sent in text format.

[E-mail...]

[E-mail...] opens the Send e-mail window (see Chapter 2.6.1, page 92).

Advertising