INFICON IC/5 Thin Film Deposition Controller User Manual

Page 35

Advertising
background image

1 - 19

IP

N 07

4-

23

7A

E

IC/5 Operating Manual

1

Confirm that AC line voltage is supplied and proper for the instrument. Line
voltage should be indicated on the instrument back label.

2

Press the power button on the front panel. A green pilot light should be seen
next to the power switch.

3

The fan at the back of the instrument should be exhausting air.

4

Video monitor will display an image similar to the one shown in

Figure 1-1

.

5

Compare the configuration information on the screen against the unit
configuration ordered.

6

Status of parameter information will be displayed. If information was valid prior
to this power up, it should stay valid.

7

After a delay, the instrument will enter the OPERATE display.

8

In the OPERATE display, confirm that the display is centered vertically. Lines
between the function keys (F1...F6) should align with the lines between the
panels on the right side of the display.

9

Using a non-conducting alignment tool, verify that the brightness pot is
operative. Adjust for the desired brightness. Access to the brightness pot is at
the bottom-center of the face panel, see

Figure 3-1 on page 3-1

.

Figure 1-1 IC/5 System Status Screen (Display will vary depending on options present)

Advertising