Servo amplifier inspection, Part replacement schedule, Operating conditions – Yaskawa FSP Amplifier User Manual

Page 268

Advertising
background image

FSP Amplifier User’s Manual

Chapter 9: Inspection, Maintenance, and Troubleshooting

9-3

9.1.2. Servo Amplifier Inspection

For inspection and maintenance of the servo amplifier, follow the
inspection procedures in the table below. Perform inspection and
maintenance at least once a year. Other routine inspections are not
required.

Action or Problem

Frequency Procedure Comments

Clean interior and circuit
boards

At least every year

Check for dust, dirt, and oil
on the surfaces.

Clean with compressed
air.

Loose screws

At least every year

Check for loose terminal
block and connector
screws.

Tighten any loose
screws.

Defective parts in unit or
on circuit boards

At least every year

Check for discoloration,
damage or discontinuities
due to heating.

Contact YEA

„

Part Replacement Schedule

The following parts are subject to mechanical wear or deterioration over
time. To avoid failure, replace these parts at the frequency indicated.
The parameters of any servo amplifiers overhauled by YEA are reset to the
default (standard factory) settings before shipping. Be sure to confirm that
the parameters are set to the application’s requirements before starting
operation.

Part

Standard Lifespan

Replacement Method

Cooling fan

4 to 5 years

Replace with new part.

Smoothing capacitor

7 to 8 years

Test. Replace with a new part, if necessary.

Relays

Test. Replace if necessary.

Fuse

10 years

Replace with new part.

Aluminum electrolytic
capacitor on circuit board

5 years

Test. Replace with new circuit board, if
necessary.

Operating Conditions:

Ambient Temperature:

Annual average of 30°C.

Load Factor:

80%, maximum.

Operation Rate:

20 hours / day, maximum.

Advertising