Chapter 16 maintenance, 1 introduction, Chapter 16 – INFICON HAPSITE Smart Plus Chemical Identification System User Manual
Page 499: Chapter 16, maintenance
16 - 1
IP
N 07
4-
47
2-
P1
C
HAPSITE Smart Plus Operating Manual
Chapter 16
Maintenance
16.1 Introduction
The HAPSITE is designed to require minimal service. Repairs will normally be
carried out at the factory or other INFICON Service Facilities. Preventive
maintenance includes cleaning the air filters and replacement of certain
consumables.
Additionally, the HAPSITE checks the system components each time a start up is
performed, and will notify the user if the following items need to have maintenance
performed:
Turbo Pump usage hours (Service Module)
Roughing Pump usage hours (Service Module)
Ion Pump usage hours (HAPSITE)
NEG Pump usage hours (HAPSITE)
For Turbo Pump, Roughing Pump, and Ion Pump maintenance, service must be
performed by a qualified INFICON Service Representative. (See
NEG Pump installation and removal is explained later in this chapter.