6 run subwindow, 1 run - general, 2 run test – Metrohm viva 1.1 (ProLab) User Manual

Page 128: Run subwindow, Run - general, Run test, Performing a run test

Advertising
background image

3.6 Run subwindow

■■■■■■■■■■■■■■■■■■■■■■

116

■■■■■■■■

viva 1.1 (for process analysis)

3.6

Run subwindow

3.6.1

Run - General

Subwindow: Workplace

Run

Run subwindow
The Run subwindow contains the controls for controlling method runs
and for administering sample data. It is always displayed in the Work-
place
program part, i.e., it cannot be removed from the workplace view.
The subwindow can be enlarged and reduced as required; it can also be
maximized.

Tabs
The Run subwindow consists of the following three tabs:

Single determination
Control of single determinations.

Determination series
Control of determination series.

NOTE

If a run has been started on the Single determination tab (Status =
BUSY), then the Determination series tab is no longer accessible
(disabled). The same holds true for the Single determination tab in
the event that a run has started on the Determination series tab.

3.6.2

Run test

Dialog window: Workplace

Single determination Tools Run test Run test -

'Workplace name' - Single determination

Dialog window: Workplace

Determination series Tools Run test Run test -

'Workplace name' - Determination series

NOTE

As opposed to the Sample table test, which checks only whether all
sample data is correct, the Run test also checks the required hardware.

Single determination

With the Tools

Run test menu item or the symbol, the start test is

carried out for the selected method. The workplace must have the status
READY for this.

Advertising