3 recalculation rules – Metrohm viva 1.1 (ProLab) User Manual

Page 297

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

4 Database

viva 1.1 (for process analysis)

■■■■■■■■

285

This button is disabled for as long as recalculation has not yet been trig-
gered and if not all the selected determinations were able to be recalcu-
lated.

[Cancel] or

Closes the Reprocess dialog window. The result of the reprocessing
made since the last saving will not be saved.

Reprocessing with history
Versioning behavior of reprocessed determinations.

Selection

On | Off

Default value

Off

On
A new version is created and saved each time a determination is repro-
cessed.
Off
The version number is increased with each reprocessing of a determi-
nation, but only two versions are stored in the database (the first, origi-
nal version and the latest, reprocessed version). In the case of already
reprocessed determinations, the version that was last saved is deleted
and a new version is created.

4.5.2.5.3

Recalculation rules

Dialog window: Reprocess

The following rules apply for recalculating the selected and modified
determinations:

Number of determinations
No more than 10 determinations may be selected for recalculation.

Start test
During the start test all device tests and device monitoring will be
ignored.

Special tracks
Series start track, series end track and error tracks are not run through
during recalculation.

Tracks with "Return immediately"
If the method contains tracks with the option Return immediately
enabled, then a warning will will appear, because it can no longer be
guaranteed that during recalculation the method will run in the same
way as during the determination.

Advertising